Garden Island Dockyards – 2000

posted in: RAM Marine System | 0

JOB: RAM MARINE SYSTEM LOCATION: Garden Island Dockyards – Sydney DETAILS: AIWC supplied the materials for 57nb piles. The RAM Series 2 System with strapping was used. TIME: Works completed 2000.