BHP Port Kembla – 2005

posted in: RAM Marine System | 0

bhp-kemb-crop

JOB: RAM MARINE SYSTEM

LOCATION: BHP / Bluescope Steel – Port Kembla

DETAILS: AIWC has supplied the RAM Series 200 System materials for HP2 Pile Refurbishment to
Southern Commercial Divers based in Wollongong since 2005.
Over 2000 piles ranging from 2.5m to 3.5 have been successfully protected
since commencement.

Time: Works commenced 2005 and are still ongoing.