BHP Wollongong – 1999

bhp-gong-crop

JOB: RAM UHB PETROLATUM SYSTEM

LOCATION: BHP NSW Ammonia Sulphate Plant – Wollongong

DETAILS: AIWC’s RAM UHB Petrolatum Tape System was installed in 1999 to the structural
steel in the Sulphate Plant which has a PH Level <whilst RH> 80%. With “No Shutdowns”,
the plant is continually damp/wet.

TIME: Works completed 1999.