JOB: RAM UHB PETROLATUM SYSTEM
LOCATION: BHP /NSW Ammonia Sulphate Plant - Wollongong
DETAILS: AIWC's RAM UHB Petrolatum Tape System was installed in 1999 to the structural steel in the Sulphate Plant which has a PH Level <whilst RH> 80%. With "No Shutdowns", the plant is continually damp / wet.
TIME: Works completed in 1999
Comments