POINT WILSON EXPLOSIVES AREA - 1999
JOB: RAM MARINE SYSTEM
LOCATION: Point Wilson Navy Explosives Area – Port Phillip Bay
DETAILS: AIWC was awarded the contract to remove the old damaged coating and apply the RAM Series 2 System to the 450nb Steel Piles with 3m wraps.
TIME: Works completed 1999.
SHOREWATER MARINE - 2019
JOB: RAM FG System
LOCATION: Fremantle, Western Australia
DETAILS: In October 2019, Shorewater Marine were selected to repair a steel superstructure in Fremantle, Western Australia. Unfortunately during construction, the unknown applicators failed to seal the HDPE sleeves correctly meaning oxygen and water was able to transfer within the anulus.
To rectify this issue, Shorewater Marine use grout to seal the sleeves at the seabed, installed continuity for a CP
system, filled all voids between the grout and headstock with RAM Marine Mastic, wrapped the entire headstock
with RAM Marine Tape then secured the system with the RAM FG Outerwrap.
RAM FG System was specifically chosen due to the difficult angles on these piles and unusual shaped headstock's with different shaped connections. The feedback AIWC received from Shorewater Marine was exceptional, Shorewater Marine were extremely happy with the RAM FG System and have no doubt they will use this system in the future.
TIME: Works completed October 2019.
BHP PORT KEMBLA - 2005
JOB: RAM MARINE SYSTEM
LOCATION: BHP / Bluescope Steel – Port Kembla
DETAILS: AIWC has supplied the RAM Series 200 System materials for HP2 Pile Refurbishment to Southern Commercial Divers based in Wollongong since 2005.
Over 2000 piles ranging from 2.5m to 3.5 have been successfully protected
since commencement.
TIME: Works commenced in 2005 and are still ongoing
BHP WOLLONGONG - 1999
JOB: RAM UHB PETROLATUM SYSTEM
LOCATION: BHP /NSW Ammonia Sulphate Plant - Wollongong
DETAILS: AIWC's RAM UHB Petrolatum Tape System was installed in 1999 to the structural steel in the Sulphate Plant which has a PH Level <whilst RH> 80%. With "No Shutdowns", the plant is continually damp / wet.
TIME: Works completed in 1999
GARDEN ISLAND DOCKYARDS - 2000
JOB: RAM MARINE SYSTEM
LOCATION: Garden Island Dockyards - Sydney
DETAILS: AIWC supplied the materials for 57nb piles. The RAM Series 2 System with strapping was used.
TIME: Works completed in 2000
Bluescope Steel at Port Kembla NSW -
February 2018
JOB: RAM Series 200
LOCATION: Garden Island Dockyards - Sydney
DETAILS: AIWC supplied the materials for 57nb piles. The RAM Series 2 System with strapping was used.
TIME: Works completed in 2000